The ship also was rigged so anew orbital inspection boom can be installed in its payload bay before its nextflight.įinaltests to Endeavour's new cockpit will be conducted during the next seven to 10days, and then technicians will begin about 8,000 preflight tests. A faulty brakingsystem critical to safe landings was repaired. They replaced more than1,000 heat-shielding tiles, which protect orbiters and astronauts from intenseheat - up to 3,000 degrees - during atmospheric re-entry. Techniciansinspected more than 150 miles of electrical wiring. The capability will play a key role in the amount of station construction work NASA can complete before the shuttle fleet is retired in 2010.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |